Group
Breweries and Microbreweries

Set of 3 GR9 ATHP burners at 120°, for tanks from 2000 to 3000L

Date: 08/07/2026

3-burner heating equipment GR9 ATHP operating on propane at 1 bar, allowing a temperature rise of 3000 l in 1°C/min in theory.
3-burner heating equipment GR9 ATHP operating on propane at 500 mbar, allowing a 2500l temperature rise in 1°C/min in theory.
3-burner heating equipment GR9 ATHP operating on natural gas at 300mbar, allowing a 2000l temperature rise in 1°C/min in theory.
Security compliant with EN ISO 13577-2 and PID regulator for 3 modulating valves and heating management via ET35ATHP enclosure for brewery applications.

Gallery